โ Back to Documentation Home
Supplier Onboarding Operations Guide
Overview
This guide provides step-by-step procedures for operations teams to onboard new suppliers to the Pinchos EDIFACT processing system. This is the operational workflow - not the technical implementation.
Quick Reference
๐ Contact Information
- Operations Support:
edi-operations@pinchos.se
- Technical Support:
edi-support@pinchos.se
- Business Development:
suppliers@pinchos.se โฑ๏ธ Standard Timelines
- Initial Response: Within 4 hours
- Technical Setup: 1-2 business days
- Testing Phase: 2-3 business days
- Go-Live: 1 business day after successful testing
- Total Onboarding: 5-7 business days
---
Pre-Onboarding Checklist
โ
Before Starting Each Onboarding
- [ ] System Health Check
- [ ] All processing services operational
- [ ] No outstanding system alerts
- [ ] Monitoring dashboards showing green status
- [ ] Recent processing volumes within normal ranges
- [ ] Documentation Current
- [ ] Supplier integration guide up to date
- [ ] Technical specifications current
- [ ] Sample files and templates available
- [ ] Contact information verified
- [ ] Support Team Ready
- [ ] Technical support available for testing phase
- [ ] Escalation procedures confirmed
- [ ] Monitoring alerts configured for new supplier
---
Onboarding Process
๐ Step 1: Initial Contact and Requirements Gathering
#### Information to Collect:
Company Details:
- [ ] Legal company name
- [ ] Display name (if different)
- [ ] Business registration number
- [ ] GLN (Global Location Number) if available
- [ ] Primary market: SE, NO, DK, FI, DE
Contact Information:
- [ ] Primary contact (name, email, phone)
- [ ] Processing notifications email (automated reports)
- [ ] Technical contact (name, email, phone for urgent issues)
- [ ] Preferred communication language
Business Requirements:
- [ ] Product categories and estimated volume
- [ ] Update frequency (daily, weekly, monthly)
- [ ] Special requirements or constraints
- [ ] Target go-live date
Integration Method Selection:
- [ ] AS2 Protocol (recommended for enterprises)
- [ ] Existing AS2 infrastructure? (Yes/No)
- [ ] Preferred AS2 Station ID
- [ ] X.509 certificate available? (Yes/No)
- [ ] SFTP Upload (file-based integration)
- [ ] SSH public key available? (Yes/No)
- [ ] Preferred file formats: EDIFACT, UBL, Excel, CSV
- [ ] Peppol Network (UBL catalogues)
- [ ] Existing Peppol registration? (Yes/No)
- [ ] GLN identifier confirmed
- [ ] Excel/CSV Upload (simplified for small suppliers)
- [ ] Technical capability for spreadsheet management
#### Documentation to Send:
- [ ] Supplier Integration Guide (appropriate for chosen method)
- [ ] Technical specifications and requirements
- [ ] Sample files and templates
- [ ] Testing timeline and expectations
- [ ] Support contact information
๐ง Step 2: Technical Configuration
#### Use the Operations Dashboard:
- Access the Supplier Management Interface
- Navigate to:
https://ops.edifact.pinchos.se/suppliers
- Login with operations credentials
- Click "Add New Supplier"
- Enter Supplier Information
- Fill in all collected company and contact details
- Select integration method(s)
- Set market and currency preferences
- Configure Integration Method
For AS2 Integration:
- [ ] Upload supplier's X.509 certificate
- [ ] Set AS2 Station ID (must be unique)
- [ ] Configure message frequency preferences
- [ ] Test certificate validity
For SFTP Integration:
- [ ] Upload supplier's SSH public key OR
- [ ] Generate new SSH key pair (system will email private key)
- [ ] Set username (auto-generated:
[supplier-id]-sftp)
- [ ] Configure directory access permissions
For Peppol Integration:
- [ ] Verify GLN registration
- [ ] Configure Qvalia account mapping
- [ ] Set catalogue fetch schedule
For Excel/CSV Integration:
- [ ] Generate SFTP credentials (same as SFTP method)
- [ ] Provide Excel template download link
- [ ] Configure validation rules
- Generate Access Credentials
- [ ] System automatically generates secure credentials
- [ ] Credentials stored in encrypted storage
- [ ] Email sent to supplier's technical contact
- [ ] Backup credentials stored in operations vault
- Deploy Configuration
- [ ] Click "Deploy Configuration"
- [ ] Wait for deployment confirmation (usually 2-3 minutes)
- [ ] Verify supplier appears in active suppliers list
#### Verify Configuration:
- [ ] AS2 Profile: Check AS2 station appears in Transfer Family console
- [ ] SFTP User: Verify user created with correct permissions
- [ ] Credentials: Confirm secure storage and email delivery
- [ ] Monitoring: Supplier added to monitoring dashboards
๐งช Step 3: Testing Phase
#### Coordinate Testing with Supplier:
- Send Test Environment Details
- [ ] Test server endpoints and credentials
- [ ] Sample test files appropriate for their integration method
- [ ] Testing checklist and success criteria
- [ ] Direct contact for testing support
- Monitor Test Execution
- [ ] Real-time Monitoring: Watch processing dashboard during tests
- [ ] Log Review: Check for any errors or warnings
- [ ] Performance Check: Verify processing times within acceptable limits
- [ ] Email Notifications: Confirm automated reports sent correctly
- Test Validation Checklist
For AS2 Testing:
- [ ] Message received and parsed successfully
- [ ] MDN acknowledgment sent back to supplier
- [ ] Products imported into database correctly
- [ ] No certificate or encryption issues
For SFTP Testing:
- [ ] Supplier can connect with provided credentials
- [ ] File upload to correct directory successful
- [ ] Processing pipeline handles file correctly
- [ ] No permission or access issues
For Excel/CSV Testing:
- [ ] Template downloaded and completed correctly
- [ ] Data validation passes without errors
- [ ] Products imported with correct formatting
- [ ] Error handling tested with invalid data
- Test Results Review
- [ ] Processing Report: Generate and review automated processing report
- [ ] Error Analysis: Address any issues found during testing
- [ ] Performance Review: Confirm processing times acceptable
- [ ] Supplier Confirmation: Get written confirmation tests passed
#### Common Testing Issues and Solutions:
Connection Problems:
- Check network connectivity and firewall rules
- Verify credentials were received and entered correctly
- Test with alternative connection methods if available
File Format Issues:
- Review file against provided samples and specifications
- Check character encoding (UTF-8 for CSV files)
- Validate EDIFACT syntax and mandatory segments
Processing Errors:
- Review error logs for specific issues
- Check product data quality and required fields
- Verify GTIN codes and pricing information
๐ Step 4: Production Go-Live
#### Pre-Go-Live Checklist:
- [ ] All tests completed successfully
- [ ] Supplier confirmed ready for production
- [ ] Production credentials generated (separate from test)
- [ ] Go-live date and time confirmed
- [ ] Support team notified and available
- [ ] Monitoring alerts configured for new supplier
#### Go-Live Process:
- Generate Production Credentials
- [ ] Use operations dashboard to generate production access
- [ ] Send production credentials to supplier
- [ ] Deactivate test credentials
- [ ] Update supplier status to "Production"
- Monitor Initial Production Usage
- [ ] First 24 Hours: Monitor closely for any issues
- [ ] Processing Metrics: Track success rates and performance
- [ ] Error Monitoring: Watch for any new error patterns
- [ ] Supplier Communication: Check in after first successful processing
- Go-Live Confirmation
- [ ] First file processed successfully
- [ ] Automated reports sent correctly
- [ ] No critical errors or performance issues
- [ ] Supplier confirms satisfaction with go-live
#### Post-Go-Live Tasks:
- [ ] Update supplier record: Mark onboarding complete
- [ ] Add to regular monitoring: Include in daily operational reviews
- [ ] Schedule follow-up: 1-week and 1-month check-ins
- [ ] Document any special considerations: Add notes to supplier profile
๐ Step 5: Ongoing Operations
#### Regular Monitoring:
- [ ] Daily: Check processing success rates and volumes
- [ ] Weekly: Review error patterns and performance trends
- [ ] Monthly: Generate processing reports for supplier
- [ ] Quarterly: Review integration efficiency and optimization opportunities
#### Maintenance Activities:
- [ ] Credential Rotation: Automated for SFTP (365 days), manual for AS2
- [ ] Certificate Renewal: Monitor AS2 certificate expiry dates
- [ ] Capacity Planning: Track volume growth and system capacity
- [ ] Documentation Updates: Keep guides current with any changes
---
Quality Assurance
๐ Security Checklist
- [ ] Credentials secured: All access keys encrypted and stored properly
- [ ] Access minimal: Suppliers can only access their designated areas
- [ ] Certificates valid: AS2 certificates current and properly configured
- [ ] Audit trail: All configuration changes logged and traceable
โก Performance Standards
- [ ] Processing time: < 30 seconds for typical catalogue files
- [ ] Success rate: > 99% of files processed without errors
- [ ] Response time: < 4 hours for support requests during business hours
- [ ] Uptime: > 99.9% system availability
๐ง Communication Standards
- [ ] Response times: Initial response within 4 hours
- [ ] Status updates: Regular communication during onboarding
- [ ] Documentation: All procedures documented and accessible
- [ ] Escalation: Clear escalation path for complex issues
---
Troubleshooting
๐จ Common Issues During Onboarding
#### Credential Issues:
Problem: Supplier cannot connect with provided credentials
Solution:
Verify credentials were received correctly
Check email spam/junk folders
Regenerate credentials if necessary
Test connection from operations environment
Check firewall and network connectivity
#### File Processing Issues:
Problem: Files uploaded but not processing
Solution:
Check file naming convention compliance
Verify file format and structure
Review processing logs for specific errors
Test with known-good sample file
Check supplier directory permissions
#### Integration Method Issues:
Problem: Chosen integration method not working as expected
Solution:
Review technical requirements with supplier
Consider alternative integration method
Provide additional technical support
Escalate to development team if needed
Document lessons learned for future onboardings
๐ Escalation Procedures
#### Level 1 - Operations Team (0-4 hours)
Standard onboarding issuesConfiguration problemsCredential managementContact: edi-operations@pinchos.se#### Level 2 - Technical Support (4-24 hours)
Complex technical issuesIntegration problemsSystem errorsContact: edi-support@pinchos.se#### Level 3 - Development Team (24-48 hours)
System bugs or limitationsNew feature requirementsArchitecture changesContact: Internal escalation only---
Success Metrics
๐ Onboarding KPIs
Average Onboarding Time: Target < 5 business daysFirst-Time Test Success: Target > 90%Go-Live Success Rate: Target 100%Supplier Satisfaction: Target > 95% positive feedback๐ Operational Metrics
Processing Success Rate: Target > 99%Average Processing Time: Target < 30 secondsSupport Response Time: Target < 4 hoursSystem Uptime: Target > 99.9%---
Document Version: 1.0
Last Updated: August 26, 2025
Next Review: November 26, 2025
Owner: Operations Team